Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/optrysys/domains/orc.lt/public_html/lib/classes/class.moduleoperations.inc.php on line 377

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/optrysys/domains/orc.lt/public_html/lib/classes/class.moduleoperations.inc.php on line 384
OR Consulting | Construction works‘ technical supervision services

Project “IX B corridor link with Klaipėda port - development of Klaipeda’s railway component, Stage III. Reconstruction of Anglinė electrical centralization” technical supervision services


Category: Construction works‘ technical supervision services

Employer: AB “Lietuvos geležinkeliai” (Lithuanian railways)

Period: 2010 - 2013

Partners:

Short project description: Project goal – to improve IX B corridor link with Klaipėda port – technical level of the Klaipėda’s railway component’s infrastructure, by performing Anglinė station tracks’ signalling, power supply, general and special telecommunications and other systems reconstruction according to customer requirements.

During the implementation of the project there were 3 non-residential buildings (33.75 m2, 3.51 m high TR 2×250 kVA transformer; 7.59 m2, 2.55 m high MT 1×400 kVA transformer; 9.37 m2, 3.00 m high DGA container) built and 7 106 m electricity, 47 790 m alarms, 14 640 m telecommunications, 8 800 m electric heating of switches and 4 450 m of video surveillance systems engineering networks installed.

Return