Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/optrysys/domains/orc.lt/public_html/lib/classes/class.moduleoperations.inc.php on line 377

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/optrysys/domains/orc.lt/public_html/lib/classes/class.moduleoperations.inc.php on line 384
OR Consulting | Construction works‘ technical supervision services

Project “Installation of Traffic management centre” technical supervision services


Category: Construction works‘ technical supervision services

Employer: AB “Lietuvos geležinkeliai” (Lithuanian railways)

Period: 2010 - 2016

Partners: SYSTRA S.A.

Project goal – to create a unified traffic management and control system, to install sub-systems and to integrate them with all systems (Siemens, Bombardier, AŽD and Neva / LUČ) and some EC stations through the PLC. During this project the equipment was installed in the new Traffic Management Centre (TMC) of JSC “Lietuvos geležinkeliai”, the premises and work places to traffic operators were designed and equipped, the integration of management and monitoring of all stations within the scope of the project from unified traffic system, the design and installation of signaling data transmission network with all the equipment needed according to the SDH network schema template, the preparation for integration and integration of axle box heating automatic detection RAKP system into a unified traffic management and control system, the integration of electricity supply and electric traction control systems into a unified traffic management and control system (SCADA), the switching of existing equipment of power supply to a centralized management system, the switching of electric traction (electrified sections) management to a centralized management system, the modernization of existing telecommunications and communications network management and monitoring equipment in TMC, the installation of telecommunications in TMC were implemented.

Return