Technical supervision services of modernization of rolling-stock automatic control. II stage


Category: Construction works‘ technical supervision services

Employer: AB “Lietuvos geležinkeliai” (Lithuanian railways)

Period: 2007 - 2010

Partners:

Short project description: Project goal – to install rolling-stock automatic control devices in Lithuanian railway sections: Kazlų Rūda-Mockava, Šiauliai-Joniškis-state border with Latvija, Radviliškis-Pagėgiai-Klaipėda, Radviliškis-Obeliai-state border with Latvia, Vilnius-Stasylos-state border with Belarus, Vilnius-Turmantas, Lentvaris-Marcinkonys, and turn them into the centralized Rolling-stock automatic control devices (RACD) system installed on 2007 during the project “Modernization of Rolling-stock automatic control devices, Stage I”.

During the Stage II another 22 RACD posts that control the temperature of axle-boxes superheating, the blocked wheels and the thread defects of trains going in both directions were installed and turned into the centralized data transmission system; 33 computerized workplaces in the stations adjacent to RACD posts were installed; 32 computerized workplaces installed during the Stage I were adapted for work in Stage II.  

The train traffic safety was improved by preventing the accidents arising from the failure of rolling-stocks; the railway infrastructure was protected from damage of the passing of disordered rolling-stocks and the conditions of damage prevention were structured.  