Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/optrysys/domains/orc.lt/public_html/lib/classes/class.moduleoperations.inc.php on line 377

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/optrysys/domains/orc.lt/public_html/lib/classes/class.moduleoperations.inc.php on line 384
OR Consulting | Preparation of feasibility studies (investment projects)

Project “Installation of European Rail Traffic Management System (ERTMS) to Lithuanian railway network” feasibility study preparation services


Category: Preparation of feasibility studies (investment projects)

Employer: AB “Lietuvos geležinkeliai” (Lithuanian railways)

Period: 2012 - 2013

Partners: SYSTRA S.A.

Project goal – considering the requirements of legal and normal documents of EU, geographical position of the Lithuanian railways network, perspectives of railway development and technical modernization of Lithuania and neighboring countries, to analyze the necessity for European railway traffic management system (hereafter referred to as ERTMS/ETCS) implementation in existing Lithuanian railway 1520 mm gauge and new 1435 mm gauge railway network to be installed, as well as economical justification, extent, levels and possible implementation options and possibilities

The feasibility study deeply analyses the technical aspects, the economical justifications, and the necessity of the implementation of the ERTMS/ETCS on the entire Lithuanian railways network and on each line and consists of:

  • Analysis of the legal aspects in European Union and Lithuania;
  • Diagnosis of existing signalling systems;
  • Analysis of the technical aspects for the implementation of ERTMS;
  • Definition of 3 scenarios for the implementation;
  • Legal, technical, economic and financial analysis of these 3 scenarios defined;
  • Description of the proposed scenario;
  • Sensitivity and risk analysis of the proposed scenario;
  • Legal aspects and legal environment information update, depending on the scenario chosen;
  • Conclusions and recommendations for the installation of ERTMS in Lithuania, installation schedule for the ERTMS/ETCS in Lithuania
  • Environmental impact assessment procedure;

Detailed action plan for implementation and cost-benefit analysis of each phase of the implementation.

Return