Preparation of Radviliškis railway component development feasibility study’s financial-economical analysis, sponsorship applications and purchase documents for contractual works


Category: Preparation of feasibility studies (investment projects)

Employer: VĮ “Geležinkelių projektavimas” (Railway design)

Period: 2008 - 2010

Partners:

Short project description: In the feasibility study the options of the existing infrastructure technical conditions modernization and optimization and the railway component development till 2020 were projected; a comprehensive analysis of Radviliškis railway component infrastructure (railway tracks, distribution hump, rail bottlenecks, track structures, crossings, power supply, signalling, interlocking and communication systems) development and technical situation was performed; the possible design solutions to infrastructure development and technical conditions improvement were examined; for the most economically advantageous and acceptable for AB “Lietuvos geležinkeliai” (Lithuanian railways) design solution applications for project funding from European Union Cohesion Fund were formulated and submitted, and the tender documents were prepared.

Return